Any position of the WBS code can be validated, so you can have a formal logic based on such condition.
Just wondering, what would be specific field requirements for CAPEX vs OPEX?
Any position of the WBS code can be validated, so you can have a formal logic based on such condition.
Just wondering, what would be specific field requirements for CAPEX vs OPEX?